The Falmouth Music Pavilion was constructed in 2008. The Pavilion is comprised of an Alaskan Yellow Cedar structure with a Douglas Fir deck and Sarnafil roof.

 

 

The Massachusetts Maritime Academy Press Box and Cardio Facility was constructed in 2010. The project consists of a second story cantilevered press box with an aluminum glazed curtainwall and a standing seam metal roof. A vertical lift was also installed to allow for handicap accessibility to the press box.